This is a ready-to-use log for tracking what a study has submitted to its Institutional Review Board or Independent Ethics Committee, what came back, and when the next continuing review is due. E6 requires ongoing review at intervals appropriate to risk and not less than once a year, and a lapsed continuing review is one of the more common IRB/IEC findings an inspector raises, usually because nobody was watching the calendar rather than because the study did anything else wrong. This log exists so someone is always watching the calendar. Replace every <<FILL: ...>> placeholder with your specifics and route it through your normal document control. A filled specimen follows. Verify cited regulations against the current source before you rely on them. This is general guidance to adapt, not legal or regulatory advice.
Submission-type legend
Define the submission codes used below so a reviewer can read the log without guessing. Adapt to your study.
Submission and review log
Field definitions
Rules
- Every row that grants an approval or favourable opinion carries forward a “next continuing review due” date, calculated at the point of approval, never left blank to be worked out later.
- Continuing review is submitted with enough lead time before the due date,
<<FILL: e.g. 60 days>>, that a normal review cycle completes before the current approval expires.
- No enrolment, consent, or protocol-required procedure continues under an approval that has lapsed. If a due date passes without a documented renewed favourable opinion, escalate the same day and pause the affected activities per
<<FILL: SOP for protocol deviation / non-compliance>>.
- An approval is checked against the exact protocol and ICF version it names before that version is used; a superseded version being treated as still-approved is a finding, not a technicality.
- A protocol amendment is implemented only after IRB/IEC approval, except where implementing it immediately is necessary to eliminate an immediate hazard to subjects; that circumstance itself gets logged here and reported per
<<FILL: SOP for protocol deviation>>, never just noted informally.
- The log itself is reviewed at a defined cadence,
<<FILL: e.g. monthly>>, by someone other than the person who files the submissions, specifically scanning the “next continuing review due” column for anything inside the lead-time window.
Common findings this log catches
- Continuing review approval expired and nobody submitted a renewal, so the study ran for a period with no valid IRB/IEC oversight.
- An amendment was implemented at sites before the IRB/IEC’s favourable opinion was received or documented.
- The version named in the current approval letter does not match the version actually in use at the site.
- A safety report was sent to the regulator on time but never separately submitted to the IRB/IEC, or was submitted late.
- The IRB/IEC’s decision letter documents “approved with modifications,” but the log (and the TMF) shows no record that the modifications were made or resubmitted.
Filled specimen
Illustrative, values invented. Study ABC-301, a 12-site oncology trial governed by a central IRB.
Reading it: SUB-004 shows the continuing review submitted 59 days before the original 2026-11-20 expiry and approved on 2026-10-08, well inside the window, so the study never operated on a lapsed approval. Had SUB-004 not appeared until, say, 2026-11-10, the monthly log review would have caught it inside the escalation window and forced an expedited submission rather than letting the 2026-11-20 date pass unwatched, which is the exact failure this log is built to prevent.
How to adapt this log
- Set your header fields and confirm which IRB/IEC (or IRBs/IECs, for a multi-board study) this log tracks; run one log per governing board if a study uses more than one.
- Replace the submission-type legend with the categories your IRB/IEC actually uses on its own forms, so the two systems speak the same language.
- Set the lead-time rule in Rules to match your IRB/IEC’s typical cycle time plus a margin, not the bare minimum.
- Point the escalation and deviation cross-references at your real SOPs.
- Confirm the continuing-review interval (E6 calls for at least annual review, scaled to risk) against what your IRB/IEC and applicable regional rule actually require before relying on a 12-month default.