Independent and not affiliated with the FDA, MHRA, ISPE, PDA, or any agency. Get the appgoutham@madhadi.com
madhadi.comData Integrity & GxP Quality
Browse all topics -> Articles Templates & Procedures Learning paths GlossaryScenariosToolsRegulatory ReferencesLearning PathsTopics About Start here
Form Plug-and-play starting point CSV / CSA

Form: Software Supplier SDLC and CSA Qualification Questionnaire

A plug-and-play, evidence-seeking questionnaire for a GxP software supplier's quality system and SDLC, covering traceability, testing, release management, Part 11/Annex 11 capability, and change notification, with scored sections, acceptable-answer and red-flag guidance, and a filled specimen.

Document type: Form

Read and copy the template below into your own quality system. It is a generic starting point for your own internal use, provided as is, with no warranty; see the Terms and License. Adopting it does not by itself create compliance.

This is a ready-to-use software-supplier qualification questionnaire built to ask for objective evidence, not just claims, so a salesperson cannot complete it in five minutes with no involvement from engineering or quality. It is distinct from a generic material or service supplier questionnaire: every question ties to a specific SDLC, traceability, or GxP-records capability a software vendor either can or cannot evidence. Replace every <<FILL: ...>> placeholder with your own specifics. A filled specimen follows. This questionnaire is educational reference, not legal or regulatory advice; confirm the current version of every referenced standard (ISO 9001, ISO 13485, Part 11 / Annex 11, SOC 2, ISO 27001) before relying on a vendor’s answer.

Instructions

Send this questionnaire to the supplier’s quality or engineering leadership, not only to sales or account management. Require attachments (certificates, redacted traceability samples, redacted test reports) wherever requested; a text answer with no attachment is a weaker response and should be scored accordingly. Score each section, then use the overall score alongside the risk tier from your supplier assessment procedure to decide whether a documentation review, remote audit, or on-site audit is also required.

Section A: Company and quality system

#QuestionEvidence requestedAcceptable answerRed flag
A1Do you operate a documented quality management system?Current certificate (ISO 9001 / ISO 13485) and scope, if certifiedCertified, or an uncertified but clearly documented QMS with named procedures”We don’t have formal certification but we’re careful” with no procedure names offered
A2Provide your top-level index of SDLC proceduresProcedure index with version and approval datesVersioned, approved, dated procedures covering requirements through releaseUndated draft list, or “we can walk you through it verbally”

Section B: Software development and traceability

#QuestionEvidence requestedAcceptable answerRed flag
B1Describe your release lifecycle. How is a requirement traced to a test result?Narrative plus the traceability sample requested in B2A named tool or method connecting requirement, design, code reference, and test”We know our product well enough not to need formal traceability”
B2Provide a redacted sample of a requirements-to-test traceability record for a recent releaseActual redacted extractA real record showing the chain end to endNo sample provided, or a sample that does not actually connect requirement to test
B3How are defects classified, tracked, and closed?Severity definitions and tool namedA closed-loop system with defined severities and closure evidenceDefects tracked in email or an informal spreadsheet with no closure record

Section C: Testing and release

#QuestionEvidence requestedAcceptable answerRed flag
C1What testing is performed before a release (unit, integration, system, regression)?Test strategy summaryDocumented strategy covering at minimum system and regression testing, with recorded results”We test thoroughly” with no description of what kinds of testing or where results are kept
C2Provide a redacted test summary or validation summary for the version you intend to useActual redacted summary for the specific version in scopeA real summary tied to the exact versionA generic marketing “quality” document, or a summary for a different version than the one in scope

Section D: Records, Part 11 / Annex 11

#QuestionEvidence requestedAcceptable answerRed flag
D1Describe audit trail, electronic signature, and access control capabilities for products holding electronic recordsFeature description, and screenshots or documentation if availableAudit trail cannot be disabled by an ordinary user, e-signatures are attributable and linked to the record, access control is role-based”Audit trail can be turned off for performance” or no clear answer
D2Confirm whether time stamps are configurable and how the system clock is controlledDescription of clock source and configurabilityClock source stated, controlled, not freely user-editable”Users can set the system clock” with no control described

Section E: Change, support, security

#QuestionEvidence requestedAcceptable answerRed flag
E1How are patches and changes communicated and released to customers?Change-notification process description, including notice period for multi-tenant SaaS releasesA defined notice period, release notes with enough detail to assess GxP impact, and (for SaaS) a sandbox/staging window ahead of production”We’ll email you when something changes” with no committed notice period
E2Describe your security vulnerability disclosure and patching commitmentsPolicy or SLA referenceDefined process and target timelines by severityNo defined process, or “we handle it case by case”
E3For hosted/SaaS: provide your latest SOC 2 Type II or ISO 27001 report and describe backup and disaster recoveryReport attached; RPO/RTO statedCurrent report (within the last 12 months) and stated recovery objectivesReport expired, unavailable, or backup/DR described only in general terms with no RPO/RTO

Scoring and disposition

FieldEntry
Section A score<<FILL: e.g. X of 2 acceptable>>
Section B score<<FILL: e.g. X of 3 acceptable>>
Section C score<<FILL>>
Section D score<<FILL>>
Section E score<<FILL>>
Overall red flags identified<<FILL: list>>
Reviewer recommendation<<FILL: questionnaire sufficient / escalate to documentation review / escalate to remote or on-site audit>>
Reviewer (name, role, date)<<FILL>>
QA concurrence (name, date)<<FILL>>

Filled specimen

Completed for an illustrative LIMS vendor, Category 4 configured product, high GxP and data-integrity impact.

#QuestionVendor answer summaryScore
A1QMSISO 9001:2015 certified, certificate attached, scope covers software developmentAcceptable
B2Traceability sampleRedacted extract provided showing REQ-0412 traced through design DES-0198 to test case TC-1187, pass, release 8.4.2Acceptable
C2Test summary for version in scopeValidation summary provided for v8.4.2, the exact version being procured, showing 214 system tests, 6 minor defects closedAcceptable
D1Audit trail/e-signatureAudit trail cannot be disabled by any user role; e-signatures meet the vendor’s stated Part 11 mapping documentAcceptable
E1Change notification30 business days notice for major releases, 5 for minor, sandbox tenant updated 10 business days before productionAcceptable
E3SOC 2Current SOC 2 Type II report dated within the last 9 months provided; RTO 4 hours, RPO 15 minutes statedAcceptable

Reviewer recommendation: “All sections score acceptable with objective evidence attached for every request. Given the high GxP and data-integrity impact of this system, escalate to a remote audit per the risk-tiered method table, using this questionnaire’s B2 and C2 evidence as the pre-read package rather than re-requesting it.”

Common inspection findings this form prevents

  • A questionnaire completed entirely by sales, with no engineering or quality input and no attachments.
  • Claims of traceability or testing accepted with no sample evidence ever requested or reviewed.
  • A test summary reviewed for the wrong product version.
  • SaaS change-notification answered vaguely, with no committed notice period later discovered to be zero when a release breaks a workflow.
  • No documented reviewer recommendation connecting the questionnaire result to the next step (accept at this tier, or escalate).

How to adapt this form

  1. Route this to supplier quality or engineering leadership specifically; a sales contact routing it without visibility into SDLC evidence produces a weak response.
  2. Require the actual redacted attachments requested in B2, C2, and E3; a text-only answer to those questions should lower the score regardless of how confident it sounds.
  3. Tie the “escalate” decision explicitly to your risk-tiered method table so the questionnaire result and the next assessment step are linked in one traceable record.
  4. Re-issue Section E on any material change to the vendor’s SaaS release process, since notice commitments can change between assessments.
Use madhadi.com as an app Full screen, works offline, one tap from your home screen.