This is a ready-to-use checklist for the computerized-system side of an equipment periodic review. It is scoped to GMP equipment that carries embedded or closely coupled software, a chromatography data system riding on an HPLC, a PLC or HMI controlling a process skid, an autoclave with a recipe-management controller, a balance whose firmware calculates and stores results, rather than to a standalone enterprise system. Run it alongside, or folded into, the equipment periodic review, mark each item Pass, Fail, or N/A with evidence, and route every Fail to CAPA. A filled specimen follows. This content is general educational reference, not legal or regulatory advice.
This checklist backs up the “computerized-system elements” line item in the Report: Equipment Periodic Review; it gives that line item named evidence instead of a single asserted cell. For a standalone GxP computerized system that is not embedded in a piece of equipment (an MES, a LIMS, a document management system), use the SOP: Periodic Review of GxP Computerized Systems and its paired evidence worksheet and report instead. For a full automation system (PLC, SCADA, DCS) reviewed as its own validated system rather than as part of one equipment asset’s review, see the Checklist: Automation System Periodic Review.
Section 0: Combine or separate
Section 1: Audit trail review status
Section 2: User access and privilege review
Section 3: Backup and restore verification
Section 4: Patch and version control against the validated baseline
Section 5: Security configuration
Section 6: Outcome
References
EU GMP Annex 11 (Computerised Systems), the periodic evaluation clause, which contemplates evaluation of current functionality, deviation and incident records, upgrade history, performance, reliability, and security.
EU GMP Annex 15 (Qualification and Validation, 2015 revision).
21 CFR Part 11 (electronic records and electronic signatures); 21 CFR 211.68 (automatic, mechanical, and electronic equipment).
ISPE GAMP 5, Second Edition (2022), A Risk-Based Approach to Compliant GxP Computerized Systems.
Confirm the current version and clause numbers of each reference before issue.
Filled specimen
The following shows the checklist completed for a chromatography data system serving a single HPLC used in release testing, reviewed alongside the instrument’s equipment periodic review. Numbers and IDs are illustrative.
Header: HPLC-11 with CDS version 4.2.1. Review period 01 June 2025 to 31 May 2026. Reviewed alongside equipment periodic review PR-2026-014. Combined track: this checklist is run as a distinct, explicitly evidenced track because the CDS serves three other instruments in the lab beyond HPLC-11 and is administered by the IT/informatics team, not by the instrument’s own maintenance group.
Verdict: Satisfactory with actions. The leaver access gap (section 2.2) is the only Fail; it is a one-time lapse in the leaver notification handoff, not a pattern, and was corrected the day it was found during the review rather than left open until the report was issued. Fed back to equipment periodic review PR-2026-014, section 8, as “computerized-system elements: satisfactory with actions, see checklist CSC-2026-031.” Next review due 31 May 2027, aligned to the instrument’s own 12-month cycle.
This specimen shows the two things this checklist exists to force: a named piece of evidence behind every line rather than a single asserted “satisfactory” cell, and an explicit statement of why the computerized-system elements were tracked separately from the equipment review for this particular instrument rather than folded in.
Common inspection findings this checklist prevents
- An equipment periodic review that states “computerized-system elements: satisfactory” with no audit trail, access, backup, version, or security evidence behind it.
- A leaver’s account still active on a GMP data system, missed because access review was assumed to be someone else’s responsibility.
- Backups reported as running with no restore ever actually tested.
- A live software or firmware version that has quietly diverged from the validated baseline with no change record explaining why.
- A broadly integrated system (serving multiple instruments) reviewed only as a line item inside one instrument’s equipment report, with no coordination against the other instruments it also serves.
How to adapt this checklist
- Use this checklist for equipment-embedded or closely coupled software; route a standalone enterprise system to the general computerized-system periodic review SOP instead, and a full automation system reviewed as its own validated asset to the automation periodic review checklist.
- Set the combine-or-separate decision in section 0 for each system once, in policy, rather than re-deciding it ad hoc at every review.
- Point sections 1 through 5 at your real audit trail review, access management, backup, change control, and security procedures so the evidence column names an actual system of record.
- Feed the outcome directly into the equipment periodic review report’s computerized-system line item, by reference, rather than re-typing a summary that loses the evidence trail.
- Confirm every regulation in the References section against the current published version before issue.